How to audit whether flagged defects were actually removed

Compare the metres, not whether the machine ran. One missing comparison means it is not finished. A sample audit is fine, but the method must be written.

A rewind record set beside the defect map

To audit whether a flagged defect was actually removed, match the metres on the defect map with the metres on the rewind record. If they match and a removal is written, that item counts as done. Seeing that the rewinder ran does not prove a sort happened.

A rewind record set beside the defect map

Why it is judged this way

Each week pull a few flagged rolls and ask three questions: is the map there, is the rewind record there, and do the metres match. If a sample does not match, that week’s release path has a hole. Do not deal only with that one roll.

What to compare

What you see What to call it What not to do
The metres match and a removal is written This roll passes the audit Only look at a signature
The map has no such roll The inspection record is missing Assume there was no defect
The recorded metres do not match Fix the process first Change the numbers on this roll

At job change or when a roll is opened

  1. Each week, pull a few rolls that have flags.
  2. Compare the two sets of metres.
  3. If they do not match, change the process, not the numbers.